[{"data":1,"prerenderedAt":100},["ShallowReactive",2],{"update-\u002Fupdates\u002F2026-02-14-construction-dpp-phased-rollout":3},{"id":4,"title":5,"body":6,"date":88,"description":89,"extension":90,"meta":91,"navigation":92,"path":93,"sector":94,"seo":95,"stem":96,"tags":97,"__hash__":99},"updates\u002Fupdates\u002F2026-02-14-construction-dpp-phased-rollout.md","Construction DPP begins phased rollout",{"type":7,"value":8,"toc":81},"minimark",[9,18,23,36,40,43,47,73],[10,11,12,13,17],"p",{},"The revised Construction Products Regulation (EU) 2024\u002F3110 began phased application on ",[14,15,16],"strong",{},"8 January 2026",". Manufacturers, importers and authorised representatives placing construction products on the EU market are now subject to transitional DPP rules.",[19,20,22],"h2",{"id":21},"what-applies-now","What applies now",[24,25,26,30,33],"ul",{},[27,28,29],"li",{},"Declaration of Performance (DoP) must be provided in electronic form with a durable link.",[27,31,32],{},"Product information files must be accessible to market-surveillance authorities in the new structured format.",[27,34,35],{},"Harmonised technical specifications begin migrating from hENs to the new Acquis Regulations per product family.",[19,37,39],{"id":38},"what-remains-transitional","What remains transitional",[10,41,42],{},"The DPP obligation itself is phased per product family, aligned with the migration of harmonised technical specifications. Families already covered by a mature hEN will see DPP obligations within 18–24 months of this milestone; newer or more complex families benefit from longer transitions (up to 2039 in edge cases).",[19,44,46],{"id":45},"foundation-guidance","Foundation guidance",[24,48,49,55,67],{},[27,50,51,54],{},[14,52,53],{},"Act now"," on the digital DoP and the product information file structure; these apply today.",[27,56,57,60,61,66],{},[14,58,59],{},"Track your product family"," on the ",[62,63,65],"a",{"href":64},"\u002Fregulations\u002Fdelegated-acts","delegated-acts tracker",".",[27,68,69,72],{},[14,70,71],{},"Plan EPD reuse",": the construction DPP re-uses EN 15804 EPD data. Getting EPDs up to date is the single highest-leverage preparation you can make this year.",[10,74,75,76,80],{},"See our ",[62,77,79],{"href":78},"\u002Fsectors\u002Fconstruction","construction sector guide"," for the detailed timeline and data-point list.",{"title":82,"searchDepth":83,"depth":83,"links":84},"",2,[85,86,87],{"id":21,"depth":83,"text":22},{"id":38,"depth":83,"text":39},{"id":45,"depth":83,"text":46},"2026-02-14","The revised Construction Products Regulation begins phased application on 8 January 2026. What is now required, and what remains transitional.","md",{},true,"\u002Fupdates\u002F2026-02-14-construction-dpp-phased-rollout","construction",{"title":5,"description":89},"updates\u002F2026-02-14-construction-dpp-phased-rollout",[98,94],"cpr","4NRNAkkehJGJmrE3JcPJOfl-W8OgNT5810Io3guQ-Is",1776873996803]